RAC Update – 8/14/2006

HVAC 

The masons from Price Masonry continue to excavate trenches in the cellar and underpin sections of the foundation that have ductwork passing under them.  Currently they are working on the northern wall of the period I house.  Preparations are also being made to start excavating the HVAC bunker, which should begin this week. 

M-103 (closet)  

Keith has finished laying the new heart pine floors in the closet.  The flooring is matchless and the same can be said of the workmanship.

M-112 (Nelly’s Dining Room) 

Steve continues to lay the new heart pine floors in the dining room.

M-004 (Wine Cellar) 

A joist that had been headed off in order to install a duPont era heating grate in the northeastern corner of the Drawing Room has been replaced. 

Cellar 

Mark Gooch continues to fabricate thresholds for the doorways between M-004/M-005 and M-008/M-009.

Garrett 

All of the king post trusses for the principal roof have been replaced and only the eastern truss in the portico remains unrestored.

Portico 

Mac has completed the decking on the portico and it is a beautiful piece of craftsmanship.

Roof 

The lighting protection system (solid copper wire attached to rods anchored to the chimneys) is being installed.

Red Room 

The re-installation of the Red Room started several weeks ago.  The new flooring has been laid, approximately half of the built-in seats/shelves have been assembled and the masons Wayne Mays and Ray Cannetti are currently working on re-installing the fireplace surround and hearth.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: