RAC Update – 1/2/2007

  

General

Bill Bichell continues to repair and re-install the Madison era trim throughout the house.

HVAC/MEP 

Temporary supports for the bunker roof are being installed.

Work on the electrical, fire suppression, VESDA, and temperature/humidity monitors continues. 

M-104/M-106 (Mr. Madison’s Room and the North Passage)

Mac Ward is installing steel flitch plates in the reconstructed partition between the two rooms.  

M-112 (Old Dining Room)

Mathew Lohmeyer continues to re-install riven lath in this room.    

M-110 (Back Chamber)

Riven lath has started to be installed on the ceiling of this room.

M-112

A door casing that had been re-used by the duPonts is being re-installed in its original location to serve the closet under the Period I stair. 

 M-207 (Drawing Room Chamber 

The north wall closet continues to be reconstructed.

Garrett 

Austin Antrim continues to install floorboards in the Madeira Garrett.

  

Chinese Railings

The bottom supports for the railings are being cut and installed.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: