Montpelier Restoration Update – 11/20/2008

Doors


Mac Ward continues to hang doors on the second floor.

keith-cutting-door-down_mg_1301blog11192008

Keith Forry is finishing the repairs to the original Madison doors.

Montpelier Restoration, November 14, 2008 Montpelier Restoration, November 14, 2008 bill-installing-recreated-screws_mg_1187blog11192008

Gene Lyman continues to install mortise locks on the doors and Bill Bichell is installing hinges and the recreated c. 1764 screws for the reproduction c. 1764 H-L hinges.

Windows

joe-installing-storms_mg_1177blog11192008

Joe Doody continues to install the interior storm windows in the Mansion.

Millwork

Blaise Gaston and Paul Pyzyana are painting the North Wing’s eastern stoop and stair, milling transoms and making a 15” threshold for the Colonnade deck door.

Colonnade

bill-preparing-for-colonnade-rail_mg_1332blog11192008

Bill Bichell is cutting holes and installing braces for the wrought-iron colonnade deck railings.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: